Smart home drawings are floor plans that show where every keypad, speaker, access point, touch screen and sensor goes, backed by a cable schedule that lists every low voltage cable by number from the device to the rack. On a London self build they should be finished before you price the electrics, because they are what your electrician wires from at first fix. This guide covers what the drawings include, who on the project uses each sheet and what you should keep once the house is finished.
Building your own home in London usually means a tight plot, a basement or a loft conversion, neighbours on both sides and a programme where every trade has a narrow window. A replacement house in Barnet, a mews rebuild in Kensington or a new house on a garden plot in Dulwich all share the same problem: once the plasterboard is up, adding a cable means opening a finished wall. The drawings are how you avoid that.
What smart home drawings should include
The architect's electrical layout shows sockets, switches and light fittings. It rarely shows the network, the audio, the lighting control or the screens. Through our survey and design service we add that layer, as a set of documents that each answer a different question.
| Sheet | The question it answers |
|---|---|
| Lighting and control layout | Where does each keypad, sensor and blind control sit, and which circuits does it work? |
| AV layout | Where are the speakers, the televisions and the video and data points in each room? |
| Network layout | Where are the wired access points and data points, including the garden and any garden office? |
| Cable schedule | What is every cable, where does it start, where does it end and what type is it? |
| Rack elevation | What goes in the rack, how much space and power does it need, and is there room to grow? |
| Control strategy | What does each button and screen do, and how do the systems work together? |
Every device is numbered on the drawings, and the same number appears on its line in the cable schedule and on the label at each end of the cable. Example pages from a real project, with the client's details removed, are on our design and documentation page.
Who uses which sheet
The drawings are not only for the electrician. On a London build they tend to pass through several hands:
- You: to agree how each room will be used, which buttons go by which door and where the televisions hang.
- Your architect and interior designer: to check keypad positions against joinery, finishes and furniture. They can have a copy with no pricing on it.
- Your builder: to allow space for the rack or comms cupboard, and ducts for any garden runs.
- Your electrician: to price, mark out and pull every cable at first fix, ticking off the schedule as they go.
- Whoever services the house later: to find any cable or device without lifting floors.
Smart home drawings and your electrician
Our founder, Kieran McGuire, is an electrician, so the drawings are written to be used on site rather than admired in a meeting. With numbered positions and a full cable schedule an electrician can count the runs, plan the routes through joists and steelwork and give you a firm price, instead of allowing for guesswork. We stay in contact with them through first fix, so questions are answered before a cable goes in the wrong place.
The drawings also keep the responsibilities clear. Your electrician remains responsible for the mains installation and its certification; our documents cover the control and low voltage side and show which lighting circuits will be controlled, so the two designs meet without gaps. Our post on why your smart home installer should understand the electrics explains how we work alongside the electrician, and our first fix wiring guide lists what must be in the walls before they close.
The information you keep at the end
A self build is building work under the Building Regulations, and the regulations expect the owner to be left with information about the house. Under regulation 40 of the Building Regulations 2010, where the energy efficiency requirement applies, the person carrying out the work must give the owner, within five days of completion, enough information about the building, its fixed building services and their maintenance requirements for it to be run without using more fuel and power than is reasonable. That is a duty on whoever does the work, and it is about energy, not smart homes. But it reflects the same principle we follow: a house should come with the information needed to look after it.
For the systems we install, that means you keep the as installed drawings, the cable schedule and the rack layout, updated with any changes made on site. If a speaker stops working in five years, or you add a room, the engineer starts from the record rather than from scratch. Our 1Install Care page explains the support we offer once you have moved in.
When to commission the drawings
Start while the architect's plans are being finalised and before you send the electrics out to tender. That gives every electrician the same scope to price, and it gives the rack a proper home on the plans. Lighting usually involves the most decisions, so our lighting design guide for London self builds is a useful read before the first meeting.
Questions we are often asked
Are smart home drawings the same as the architect's electrical plan?
No. The architect's plan shows power and lighting points. Smart home drawings add the network, audio, video, control and security, with every cable numbered and scheduled.
Can the drawings change after they are issued?
Yes, and on most builds they do. We revise the drawings and the cable schedule and reissue them so everyone works from the latest version.
Will my architect see our quote?
Not unless you want them to. Your architect, builder and designers can have a version of the design with no prices on it.
Do I need drawings for a small house?
Even a modest house with Wi-Fi, a few speakers and lighting control has a long list of cables, and the drawings make sure each one ends up in the right place.
What does the first meeting cost?
A design consultation is £360 plus VAT, and extra time is £90 an hour plus VAT, as shown on our booking page.
Book a consultation or call our head office on 01344 937999 (London office 0208 064 0196).